Biking & Walking
Active Transportation

Active Transportation (Walking and Biking)

Active Transportation, also known as non-motorized transportation, refers to human-powered mode of travel such as walking and biking, primarily. The regional transportation system currently lacks sufficient non-motorized provisions along many corridors where bicycling and walking should be viable travel choices–especially for short trips. In light of rising energy costs, an aging population, public health concerns, and increasing demand for alternatives to motor vehicle travel, there is a growing need for infrastructure and development patterns that support what has widely become known as “active transportation.”

B-ACTIVE Plan logo

B-ACTIVE Plan logo

The B-ACTIVE Plan is the Active Transportation Plan for the Greater Birmingham Region and  is intended to help establish a clear vision for short- and long-term projects that are needed to build a safer, more connected, and equitable active transportation system for the region. The Plan will serve as a resource for the Metropolitan Planning Organization (MPO) to plan, fund, and ultimately build more bicycle and trail facilities, and will provide guidance for the region’s local municipalities when developing their bicycle and pedestrian elements. The Plan will describe how the region is working together to connect and support active transportation.  

The contents of the Plan includes:

  • Chapter 1 – Introduction: Existing conditions, existing plan review and plan goals and objectives

  • Chapter 2 – More Users: Public engagement and outreach findings

  • Chapter  3 – Connectivity: Regional Active Transportation Network, network approach and development

  • Chapter 4 – Implementation: Project vetting methods, project Identification, policy roads, context sensitive design, facility selection guidance, phasing, programs and policies

  • Appendix A – Demand analysis method, level of comfort analysis methodology, survey questions

  • Appendix B- Indicator criteria

  • Appendix C- Project lists, study area network maps

  • Appendix D – Menu of cross sections by context, detailed cost estimates

Download a summary presentation of the plan here:

 B Active Presentation to MPO Committees – Feb and March 2019

For more information contact Hunter Garrision at hgarrison@rpcgb.org 205-264-8442

Regional Active Transportation Plan – “B-ACTIVE Plan” – Adopted March 2019

Download the adopted plan below:

B-ACTIVE Plan – Adopted March 2019 – with Appendices

B-ACTIVE Plan – Adopted March 2019 – without Appendices

Appendix A – Methods

Appendix B – Network Indicators

Appendix C – Project Lists and Study Area Maps

Appendix D – Menu of Facility Options and Cost Estimates

B-ACTIVE Plan - Executive Summary

Additionally, The B-ACTIVE Plan has it’s own site with an interactive map of the plan and existing facilities. Click below to visit the plan site:

www.B-ActivePlan.com

B-ACTIVE Plan Annual State of the Network Report

As part of an ongoing effort to track and celebrate success in implementing the B-ACTIVE Plan and other active transportation projects in the region, the RPCGB will publish an annual “State of the Network”. Click below to view the first annual report.

B-Active Plan Annual State of the Network Report, 2019


Red Rock Ridge and Valley Trail System Plan

In 2010, the Freshwater Land Trust (FWLT), received grant funding to develop a greenway master plan for Jefferson County, Alabama. The purpose of this plan was to develop a feasible strategy for greenways and bicycle and pedestrian infrastructure that would promote active and healthy living, encourage alternate modes of transportation, and protect regional waterways.

The Red Rock Ridge and Valley Trail System Plan presents a roadmap for a regional greenway and street-based trail system to connect communities across Jefferson County. The plan proposes over 200 miles of shared-use greenways and trails along six main corridors, as well as over 600 miles of street-based bicycle and pedestrian pathways that aim to connect the corridors and surrounding areas.

The Red Rock Ridge and Valley Trail System Plan is primarily designed as an implementation tool, supplying all the information municipalities and cooperating organizations need to apply for grants to fund the site design and construction of trail segments. Existing greenways and bicycle-pedestrian master plans at the municipal level were carefully incorporated into the Red Rock Ridge and Valley Trail System Plan, to ensure connections are made between communities as part of the overall network.

The City of Birmingham has formally adopted the Red Rock Ridge and Valley Trail System Plan and has strongly encouraged local governments to review and adopt their portion of the Red Rock Plan.

Additional information can be found at RedRockTrail.org or by contacting the Carolyn Buck at the Freshwater Land Trust. carolyn.buck@freshwaterlandtrust.org , 205-417-2777


Bikeshare

Birmingham BikeShare planning began in the summer of 2013. Through its CommuteSmart Program, the RPCGB conducted a feasibility study and implementation plan for the City of Birmingham, which was completed in July 2014. Through the cooperation of REV Birmingham, RPCGB, and the City of Birmingham, Zyp BikeShare was deployed in October 2015 with 40 kiosks and 400 bikes which can be rented 24 hours a day, 365 days a year.